top of page

New installation Opacmare Europe supplies

  • Foto van schrijver: Daniel
    Daniel
  • 15 mei 2018
  • 1 minuten om te lezen

Bijgewerkt op: 24 mei 2018

We are proud to announce a perfect installation by one of our Dutch shipyard installations on board of one of their beauties.

Products installed; Extended box gangway, a Fly-Bridge crane, A Bathing ladder and Semi automatic side Door with patented emergency release system


Ā 
Ā 
Ā 

Comments


bottom of page